Tuesday, 1 March 2016

A18 Melton Ross Railway Bridge Roadworks

As from 1st March 2016 the traffic light controlled contra-flow has gone, and the bridge is open to HGVs in both directions. It's been on-going since July 2013. When the Lincs FM announce gave us the news he played a fanfare on the radio!!

No comments:

Post a Comment